CHALLENGE
A multi-family building management company tasked Steady Solutions with installing 25 Level 2 Electric Vehicle (EV) chargers inside their parking structure. The primary challenge was to seamlessly integrate the chargers into the existing infrastructure while ensuring optimal accessibility, functionality, and safety for residents. Meeting the growing demand from tenants for EV charging facilities while adhering to budgetary constraints provided a significant challenge for our professional team to overcome.
SOLUTION
Steady approached the project with a comprehensive strategy. Firstly, thorough site assessments were conducted to determine the most efficient placement of the chargers within the parking structure. Close collaboration with electrical engineers resulted in the design of a robust charging infrastructure capable of supporting all 25 EV chargers simultaneously. To address budgetary concerns, Steady explored cost-effective equipment options and optimized installation methodologies without compromising on quality or safety. Rigorous testing and quality assurance measures were implemented to guarantee the reliability and performance of the charging system.
RESULTS
Steady Solutions successfully completed the installation of 25 Level 2 EV chargers within the multi-family building’s parking structure. Residents now have convenient access to reliable charging facilities, supporting the adoption of electric vehicles and contributing to sustainability efforts. The seamless integration of the chargers into the parking structure enhances the overall appeal of the property and demonstrates the management company’s commitment to providing modern amenities for its residents. Steady’s efficient project execution and dedication to quality have solidified its reputation as a trusted partner in implementing EV charging solutions for multi-family residential buildings.